Herts and Essex Site Investigations homeHerts and Essex Site Investigations company profileHerts and Essex Site Investigations key servicesHerts and Essex Site Investigations ratesHerts and Essex Site Investigations contact usHerts and Essex Site Investigations links
Herts and Essex Site Investigations rule
Herts and Essex Site Investigations arrow
Herts and Essex Site Investigations arrow
Herts and Essex Site Investigations arrow
Herts and Essex Site Investigations arrow
Herts and Essex Site Investigations arrow
Herts and Essex Site Investigations arrow

Intrusive Works

1 Rates for 150mm dia Shell & Auger Boring

ITEM DESCRIPTION UNIT RATE

1a

Transport of men and equipment to and from site

per rig

£285.00

1b

Set up rig and equipment at each borehole location

No.

£45.00

1c

Boring from 0 - 10m below the surface

m.

£18.00

1d

Boring from 10 - 20m below the surface

m.

£20.00

1e

Boring from 20 - 30m below the surface

m.

£23.00

1f

Boring from 30 - 40m below the surface

m.

£28.00

1g

Undisturbed Samples

No.

£15.00

1h

Standard Penetration Tests

No.

£15.00

1j

Bulk Disturbed Samples (12kg)

No.

£3.50

1k

Groundwater Samples

No.

£4.50

1m

Extra over times 3, 4, 5 and 6 for chiselling through obstructions or digging pits for locating services

/hr.

£32.00

1n

Standing time awaiting clients instructions

/hr.

£32.00

1o

Daytime such as winching/permeability tests

/hr.

£32.00

1p

Provide and install UPVC stand-pipe and pea shingle surround

m.

£15.00

1q

Install stand-pipe supplied by client

m.

£5.00

1r

Provide and install Piezometer tip

No.

£25.00

1s

Provide and install stopcock box cover

No.

£25.00

1t

Backfill borehole with cement/bentonite grout

m.

£11.50

1u

Provide and install slab over borehole

No.

£13.00

1v

Vane Test

No.

£30.00

1w

0.5m bentonite pellet seal

No.

£15.00

Note: Special rates apply for Restricted Access 150mm dia Shell & Auger Boring Rig please contact this office for a quotation and lead in times

2 Window Sampler & Dynamic Probing

ITEM DESCRIPTION UNIT RATE

2a

Window Sampler (based on 3No. 6m deep boreholes through cohesive soils)

/day

£650.00

2b

Dynamic Probing

/day

£650.00

3 JCB Trial Pitting

ITEM DESCRIPTION UNIT RATE

3a

Engineer to attend site, record trial pits, carry out in-situ testing & recover bulk samples

/day

£300.00

3b

Engineer to undertake Permeability Testing (in addition to 4a)

/hr

£40.00

4 Existing Foundation Exposure Works

ITEM DESCRIPTION UNIT RATE

4a

Engineer to attend site, excavate & record footing details, carry out in-situ testing & recover bulk samples from hand augured boreholes (maximum number of trial pits attempted in one day is five)

/day

£300.00

Herts and Essex Site Investigations back to top off

Herts and Essex Site Investigations footerlink to Gregory Gray Graphic Design